| 5093607 |
false |
|
false |
|
2024-02-29 19:37:14.341 |
| 4561113 |
false |
|
false |
CFE & CFO fee to be paid for the investment of Rs.2.24 crores under Red category for 1 year & 2 months period i.e., from Jan'2023 to Mar'2024 is Rs.1,06,400/- (67200+39200). The industry earlier paid Rs.25,000/- through TS-iPASS for CFE application and now paid Rs.50,000/- through TS-iPASS. Hence balance fee to be paid is Rs.31,400/- for further processing. |
2023-05-02 19:29:55.153 |
| 4706909 |
false |
|
true |
The industry has submitted empty application. The industry has not submitted details of raw material, product, water consumption, waste water generation, treatment and disposal, Air emissions (Boiler, Thermic fluid heater, DG set, Furnace etc.,) and its Air pollution control equipment, Solid/Hazardous waste generated and disposed. The industry shall fill the details and resubmit the application.
The industry shall also upload CFE condition wise compliance report. |
2023-07-24 16:01:11.323 |
| 5093853 |
false |
|
false |
1. Provided seperate storage location about 100 sq meters adequately constructed for Briquette storage, Boiler fly ash will be stored by providing a partition.
2. A separate energy meter for dust collector mechanism
3. Sludge management has been handled as per PCB norms
4. Boiler Briquette consumption not crossed 7.5 Tons/day at any time.
5. Disposal of plaste waste has been sent to authorised vendor for recycling purpose. |
2024-03-01 09:01:23.175 |
| 5093856 |
false |
|
false |
Dear Sir, Additional Fee is paid and we have already submitted Bathing and washings consumption and effluent generation quantities and also ETP and STP treatment system designs. Kindly refer to the attached EMP report in Page 4&5. Regards, Sunil Kulkarni-Consultant |
2024-03-01 09:22:42.305 |
| 5093861 |
false |
|
false |
|
2024-03-01 10:18:36.373 |
| 5093862 |
false |
|
false |
|
2024-03-01 10:19:03.596 |
| 5093863 |
false |
|
true |
Sir, you are requested to submit the certifed site plan with total area, built up area and GPS coordinates of each corner of the site, submit the signed TS-iPASS self certification form and process flow chart for further processing of your application. |
2024-03-01 10:25:17.208 |
| 5093878 |
false |
|
false |
|
2024-03-01 10:43:50.706 |
| 5093896 |
false |
|
false |
|
2024-03-01 10:48:54.836 |