ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
6035222 false false 2025-07-01 13:53:03.985
6035235 false false 2025-07-01 13:53:42.295
6035236 false false 2025-07-01 13:54:01.57
6035237 false true As per the CPCB directions dated 29.04.2025 issued in compliance with the Hon’ble NGT Order dated 25.10.2021 in OA No. 400 of 2019, Advanced Batch Automated Process (ABAP) Tyre Pyrolysis Oil (TPO) units shall only be allowed. As per the siting criteria under SOPs issued by CPCB vide 16.01.2024, new ABAP Type TPO units shall be allowed only in the industrial areas / land. As per the revised SOPs, the TPO unit having cumulative maximum batch capacity upto 60 Tonnes per day only be allowed within a premises. In view of the above, the proponent shall clarify the compliance with the above CPCB directions. 2025-07-01 13:54:09.602
6035246 true CFO order approved. false 2025-07-01 13:54:58.151
6035250 false false 2025-07-01 13:55:59.234
6035484 false false 2025-07-01 15:26:20.554
6035535 true CFE order approved. false 2025-07-01 15:31:28.728
6035545 false false 2025-07-01 15:33:05.619
6035266 false true Sir, you are requested to submit the latest TG IPASS self certification form, revised site plan with exisiting and proposed total area and built up area duly demarcating both proposed and exisiting areas with enough land provision for onland irrgation of treated water, existing CFO order condition wise compliance status, comparative statement of exisiting and proposed details with repsect to production details, water consumption, waste water generation, solid/hazardoud waste generation for further processing of your application. 2025-07-01 14:08:38.672
Previous1..30300303013030230303303043030530306303073030830309..30346Next