Respected Sir/Madam,
With reference to your communication regarding the submission of pending documents for Consent for Establishment (CFE), we are hereby submitting the following for your kind perusal:
Revised CFE Project Report incorporating:
Raw material list
Water consumption and wastewater generation details
Solid and hazardous waste generation & disposal methods
Environmental safeguards and greenbelt plan
Self-Certification Form on Rs. 100/- non-judicial stamp paper is also attached as per the requirement.
Site plan with total plot area and built-up area details
We further confirm that:
No boiler or thermic fluid heater is proposed or used in the present manufacturing activity.
The core activity of our unit is Electrical Panel Manufacturing, and the surface treatment (phosphating + powder coating) is only an integrated part of the overall fabrication process and not a standalone chemical processing operation.
Regarding the activity selection on the TSPCB portal, we request your kind guidance in choosing the most appropriate category. Based on our operations, the following options are available:
Engineering and Fabrication Unit
Engineering with Painting Activity
Engineering without Painting Activity
Since our process includes surface pretreatment and powder coating, but not full-scale painting or plating, we seek your clarification on whether “Engineering with Painting Activity” is a suitable activity to select under the Red Category, or whether a specific option is recommended for electrical panel manufacturing involving surface treatment.
We assure you that all environmental safety and compliance measures will be duly followed.
We kindly request you to consider our revised submission and guide us for further processing of the application. |