ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
6082656 false false 2025-07-30 13:29:07.731
6082682 false false 2025-07-30 13:35:28.597
6082689 false false 2025-07-30 13:41:30.576
6082893 false false 2025-07-30 15:38:49.755
6082912 false false 2025-07-30 15:45:23.673
6083037 true CFE order approved false 2025-07-30 15:56:25.299
6083421 false false 2025-07-30 16:26:50.505
6083486 false false Respected Sir/Madam, With reference to your communication regarding the submission of pending documents for Consent for Establishment (CFE), we are hereby submitting the following for your kind perusal: Revised CFE Project Report incorporating: Raw material list Water consumption and wastewater generation details Solid and hazardous waste generation & disposal methods Environmental safeguards and greenbelt plan Self-Certification Form on Rs. 100/- non-judicial stamp paper is also attached as per the requirement. Site plan with total plot area and built-up area details We further confirm that: No boiler or thermic fluid heater is proposed or used in the present manufacturing activity. The core activity of our unit is Electrical Panel Manufacturing, and the surface treatment (phosphating + powder coating) is only an integrated part of the overall fabrication process and not a standalone chemical processing operation. Regarding the activity selection on the TSPCB portal, we request your kind guidance in choosing the most appropriate category. Based on our operations, the following options are available: Engineering and Fabrication Unit Engineering with Painting Activity Engineering without Painting Activity Since our process includes surface pretreatment and powder coating, but not full-scale painting or plating, we seek your clarification on whether “Engineering with Painting Activity” is a suitable activity to select under the Red Category, or whether a specific option is recommended for electrical panel manufacturing involving surface treatment. We assure you that all environmental safety and compliance measures will be duly followed. We kindly request you to consider our revised submission and guide us for further processing of the application. 2025-07-30 16:32:03.259
6081146 false false 2025-07-29 15:46:29.477
6081301 false false 2025-07-29 16:52:12.254
Previous1..30538305393054030541305423054330544305453054630547..33109Next