ApplicationProcessingDetails List

Id Approve Approve Note Clarification Clarification Note Date Created
6466812 false false 2026-03-06 17:36:35.159
6466868 false false 2026-03-06 17:58:38.22
6466877 false false 2026-03-06 18:01:25.0
6466919 false false 2026-03-06 18:02:03.994
6466947 false false 2026-03-06 18:08:47.945
6466961 false false 2026-03-06 18:10:10.757
6466967 true CFE order approved false 2026-03-06 18:11:09.128
6466974 false false 2026-03-06 18:13:38.925
6466686 false true As observed from the Topo & Site plans the proposed site is adjacent to NH-44 which is not meeting the sitting guidelines of the Board i.e As per the siting guidelines from transportation / communication system the industry shall maintain width of buffer zone from the Road Land Boundary i.e., National Highway–50 Mts, State Highway–40 Mts & MDR / Village Road-20 Mts. The proponent shall submit detailed EMP report comprising the following; i. Process Flow chart & description along with details of the machinery involved in the process along with capacities. ii. Raw material used along with chemicals in Kgs/Day (or) Tons/Day iii. Products manufactured in Kgs/Day (or) Tons/Day. iv. GPS coordinates (Longitude & Latitude) of the plant. v. Water consumption & waste waste generation and its treatment & disposal. vi. Sources of air pollution (Boilers, Generators etc.) and proposed air pollution control measures and equipment details. vii. Proposed DG set details if any. viii. Solid waste generation and its disposal details. ix. Proof of Project cost (Gross fixed assets) 2026-03-06 17:13:40.078
6466836 false false 2026-03-06 17:42:29.35
Previous1..32634326353263632637326383263932640326413264232643..32942Next