| 6720770 |
false |
|
true |
• As observed from the Topo & Site plans the proposed site is not meeting the sitting guidelines of the Board. https://tgpcb.cgg.gov.in/Home/SitingGuide.
• The proponent shall submit additional land documents to meet the 60 TP production capacity.
• The proponent shall submit EMP report (details of boiler capacity, Water consumption & Waste water generation and ETP treatment and disposal.
• Sources of air pollution and details of control equipment.
• Solid waste generation and its disposal.
• Proposed DG set details.
|
2026-07-15 18:10:26.493 |