Show ApplicationProcessingDetails

Id: 1559343
Approve: false
Approve Note:
Clarification: true
Clarification Note: 1. As per process submitted by the proponent following details required to process application: a) The proponent shall submit capacity of pulverizer with Air Pollution Control Measures b) The quantity of waste water generation (washing effluents ) and its treatment. c) The proponent has to submit boiler, APCE details and also water details is proposing for boiler for purpose of heating as mentioned in process that using coal as fuel for heating purpose i.e., upto 180O C d) The proponent has not submitted process description for other products i.e., Sheets / GRG Board, POP Designs, Jointing Motorar, Tile Adhesive & Putty and Building Products. e) The proponent shall submit quantity of Hazardous/Solid waste generation and its disposal
Date Created: 2018-08-25 13:19:05.534
File Note: 1. As per process submitted by the proponent following details required to process application: a) The proponent shall submit capacity of pulverizer with Air Pollution Control Measures b) The quantity of waste water generation (washing effluents ) and its treatment. c) The proponent has to submit boiler, APCE details and also water details is proposing for boiler for purpose of heating as mentioned in process that using coal as fuel for heating purpose i.e., upto 180O C d) The proponent has not submitted process description for other products i.e., Sheets / GRG Board, POP Designs, Jointing Motorar, Tile Adhesive & Putty and Building Products. e) The proponent shall submit quantity of Hazardous/Solid waste generation and its disposal
Inspection: false
Inspection Note:
Officer: TSPCB010
Reject: false
Reject Note:
Role: RO EE