Show ApplicationProcessingDetails

Id: 1712751
Approve: false
Approve Note:
Clarification: false
Clarification Note:
Date Created: 2018-11-26 12:56:05.749
File Note: a) As per EC Order dated 02.11.2017, it was mentioned that the emissions from boilers shall be routed through appropriate Air Pollution Control equipment followed by stacks of adequate height. The concentration of particulates in the emissions shall not exceed 100 mg/Nm3. Sampling Prot with removable dummy of not less than 15 cm diameter in the stack at a distance of 8 times the diameter of the stack from the nearest constraint such as bends etc., shall be provided to monitor stack emissions. Stacks f adequate height shall be provided for D.G.Sets, as per CPCB norms. b) In the CFE application, it was proposed to install boiler for the MEE system. But, the capacity of the boiler proposed and air pollution control details are not furnished.
Inspection: true
Inspection Note:
Officer: TSPCB100
Reject: false
Reject Note:
Role: ro ee