| Clarification Note: |
The industry has not mentioned details of waste water generation, treatment and disposal details, Air pollution Sources ( Boiler, Thermic fluid/electric heater) and control measures , Solid waste generation and disposal details in respective fields of online application, same shall be filled in the application. The industry shall also upload the registered land lease documents. |
| File Note: |
The industry has not mentioned details of waste water generation, treatment and disposal details, Air pollution Sources ( Boiler, Thermic fluid/electric heater) and control measures , Solid waste generation and disposal details in respective fields of online application, same shall be filled in the application. The industry shall also upload the registered land lease documents. |