
| Id: | 3042525 |
| Approve: | false |
| Approve Note: | |
| Clarification: | true |
| Clarification Note: | The industry has not mentioned details of waste water generation, treatment and disposal details of waste water generated, Air pollution Control equipment details to the proposed boiler/DG set, Solid waste generation and disposal details in respective fields of online application. The same shall be filled in the online application and resubmit application in full form. The industry has uploaded Environment Management plan wherein the design calculation details of the Effluent treatment Plant(ETP) and Air Pollution Control Equipment(APCE) shall be submitted . Note: The application will be liable for Rejection at pre-Scrutiny stage if the proponent fails to submit the above information sought. |
| Date Created: | 2021-04-20 00:14:10.33 |
| File Note: | The industry has not mentioned details of waste water generation, treatment and disposal details of waste water generated, Air pollution Control equipment details to the proposed boiler/DG set, Solid waste generation and disposal details in respective fields of online application. The same shall be filled in the online application and resubmit application in full form. The industry has uploaded Environment Management plan wherein the design calculation details of the Effluent treatment Plant(ETP) and Air Pollution Control Equipment(APCE) shall be submitted . Note: The application will be liable for Rejection at pre-Scrutiny stage if the proponent fails to submit the above information sought. |
| Inspection: | false |
| Inspection Note: | |
| Officer: | TSPCB008 |
| Reject: | false |
| Reject Note: | |
| Role: | RO EE |