| Clarification Note: |
The proponent has not mentioned details of water consumption, waste water generation and treatment system proposed, sources of Air pollution(Boiler/ DG set etc.,) and control Equipment proposed, solid waste generation quantities(raw material rejects/ waste oils/ sludge etc.,) & disposal method in the respective fields of online application. The same shall be filled in the online application and resubmit application in full form. The industry shall mention “Nil/NA/0” in the respective fields if details are not applicable. The industry shall upload condition wise compliance to the existing CFO order issued by the PCB. Note: The application will be liable for Rejection at pre-Scrutiny stage if the proponent fails to submit the above information sought. |
| File Note: |
The proponent has not mentioned details of water consumption, waste water generation and treatment system proposed, sources of Air pollution(Boiler/ DG set etc.,) and control Equipment proposed, solid waste generation quantities(raw material rejects/ waste oils/ sludge etc.,) & disposal method in the respective fields of online application. The same shall be filled in the online application and resubmit application in full form. The industry shall mention “Nil/NA/0” in the respective fields if details are not applicable. The industry shall upload condition wise compliance to the existing CFO order issued by the PCB. Note: The application will be liable for Rejection at pre-Scrutiny stage if the proponent fails to submit the above information sought. |