| Clarification Note: |
The industry has not mentioned details of waste water generation treatment and disposal, Air pollution Sources( Boiler, Thermic fluid/electric heater) and control measures, solid waste generation and disposal in respective fields of online application same shall be filled in the application. The industry shall mention “Nil/NA/0” in the respective fields if details are not applicable.
The industry has paid CFE fee of Rs. 5000/- for both acts under Orangecategory against the required fee of Rs.2,25,000/-. Hence, the industry has to pay balance fee of Rs.2,20,000/-.
|
| File Note: |
The industry has not mentioned details of waste water generation treatment and disposal, Air pollution Sources( Boiler, Thermic fluid/electric heater) and control measures, solid waste generation and disposal in respective fields of online application same shall be filled in the application. The industry shall mention “Nil/NA/0” in the respective fields if details are not applicable.
The industry has paid CFE fee of Rs. 5000/- for both acts under Orangecategory against the required fee of Rs.2,25,000/-. Hence, the industry has to pay balance fee of Rs.2,20,000/-.
|