| Clarification Note: |
As per the process flow chart, the applicant is proposing synthesis of API for which the proponent has to obtain EC as per EIA Notification 2006. Hence submit the application after obtaining EC along with the details of raw materials, products, water consumption, wastewater generation and disposal, Soild/Hazardous waste generation and disposal details, Boiler/DG set capacities if any for further processing. |
| File Note: |
As per the process flow chart, the applicant is proposing synthesis of API for which the proponent has to obtain EC as per EIA Notification 2006. Hence submit the application after obtaining EC along with the details of raw materials, products, water consumption, wastewater generation and disposal, Soild/Hazardous waste generation and disposal details, Boiler/DG set capacities if any for further processing. |