Show ApplicationProcessingDetails

Id: 4264964
Approve: false
Approve Note:
Clarification: false
Clarification Note: To, 14-12-2022 The Environmental Engineer, T.S.P.C.B. Sanga ReddyDist. Sir, Sub- Submission of shortfall information /documents for issue of CFE of our New unit -II Req. Reg. Ref- Our Tsipass application no. SML004001767271 With reference to the above cited we are herewith submitting the shortfall information/documents as per the query raised by the good office as follows 1) The solid waste generation and disposal details are SLAG AND FOREIGN MATERIALS 5/TPD and which is LAND FILLED within the premises 2) Ours is orange category and 90/TPD which does not cross 30,000/TPA in our UNIT -II so EIA does not require 3) Copies of AIR POLLUTION control design and equipment 4) We are setuping UNIT-II with all norms (i.e separate power connection, separate entrance, separate facility,) and we have got all the approvals from DT&CP, DIRECTOR OF FACTORIES, TSPDCL, NALA, as per the TS-IPASS so ENVIROMENTAL CLEARANCE is not required. 5) Our Unit -I facility is separated from Unit-II all We, ought we have provided all the information as requested; Hence we request our good self to process and issue the CFE at the earliest. Thanking You, Yours faithfully For ANSH ISPAT LLP UNIT-II PARTNER
Date Created: 2022-12-15 08:11:55.138
File Note: To, 14-12-2022 The Environmental Engineer, T.S.P.C.B. Sanga ReddyDist. Sir, Sub- Submission of shortfall information /documents for issue of CFE of our New unit -II Req. Reg. Ref- Our Tsipass application no. SML004001767271 With reference to the above cited we are herewith submitting the shortfall information/documents as per the query raised by the good office as follows 1) The solid waste generation and disposal details are SLAG AND FOREIGN MATERIALS 5/TPD and which is LAND FILLED within the premises 2) Ours is orange category and 90/TPD which does not cross 30,000/TPA in our UNIT -II so EIA does not require 3) Copies of AIR POLLUTION control design and equipment 4) We are setuping UNIT-II with all norms (i.e separate power connection, separate entrance, separate facility,) and we have got all the approvals from DT&CP, DIRECTOR OF FACTORIES, TSPDCL, NALA, as per the TS-IPASS so ENVIROMENTAL CLEARANCE is not required. 5) Our Unit -I facility is separated from Unit-II all We, ought we have provided all the information as requested; Hence we request our good self to process and issue the CFE at the earliest. Thanking You, Yours faithfully For ANSH ISPAT LLP UNIT-II PARTNER
Inspection: false
Inspection Note:
Officer: ANSHMEII118931
Reject: false
Reject Note:
Role: Industry