
| Id: | 4405687 |
| Approve: | false |
| Approve Note: | |
| Clarification: | false |
| Clarification Note: | With reference to the above cited, we are herewith submitting the shortfall information/documents for issue of C.F.E. under TS-iPASS as per the query raised. Further we submit we are ready to pay shortfall of payment but in our TSipass portal the additional payment is not showing , we request you to raise the additional payment in TSIPASS we will pay the same Water Water Source Details: Source Type Source Name Quantity (KLD) Ground Ground Water 107 Water Consumption Details: Source Quantity (KLD) Process 0 Boiler feed/makeup 100 Cooling water makeup 2 Greenbelt 3 Domestic 2 TOTAL 107 Waste Water Discharge: Purpose Quantity (KLD) Domestic 2.0 Boiler Blow Down 5.0 Cooling Bleed off 0.2 TOTAL 7.2 Point of Final Discharge: Source Point of Final Discharge Boiler blow down Ash Quenching Cooling bleed off Greenery Domestic Septic tank followed by soak pit Waste Water Characteristics: Source Temperature PH Colour Boiler Blow Down 32 06 Normal Solid Waste Generation Non – Hazardous: Description Quantity Units Disposal Husk Ash 9 Tons/day Sold to Brick Manufactures DG set used oil 50 LPA sold to reg. recyclers Source of Air Pollution Air Stack Details: Stack Name Proposed Air Pollution Control System Stack Height above ground level Stack Top Are any standard of emission prescribed for or adopted by your industry Thermic Fluid boiler 15 lakh kal/hr Cyclomax, followed by bag filters 30mtrs Round/Circular Yes 10 TPH Boiler Cyclomax, followed by bag filters 30 mtrs Round/Circular Yes Nature of Dust: Stack Nature of Dust Quantity 10 TPH boiler Husk Ash 9TPD (SOLD TO REG. BRICK MANUFACTURES ) Fuel used details: Name of fuel Daily Consumption Unit Purpose Husk 48 Tons/day Boiler We ought we have provided all the information as per the query raised for the issue of C.F.E we now request our goodself to process our application and issue the CFE at the earliest. Thanking you Yours faithfully For SRI TULSI INDUSTRIES PARTNER Encl: 1. ETP Diagram 2. Boiler Technical Details |
| Date Created: | 2023-02-18 13:38:26.75 |
| File Note: | With reference to the above cited, we are herewith submitting the shortfall information/documents for issue of C.F.E. under TS-iPASS as per the query raised. Further we submit we are ready to pay shortfall of payment but in our TSipass portal the additional payment is not showing , we request you to raise the additional payment in TSIPASS we will pay the same Water Water Source Details: Source Type Source Name Quantity (KLD) Ground Ground Water 107 Water Consumption Details: Source Quantity (KLD) Process 0 Boiler feed/makeup 100 Cooling water makeup 2 Greenbelt 3 Domestic 2 TOTAL 107 Waste Water Discharge: Purpose Quantity (KLD) Domestic 2.0 Boiler Blow Down 5.0 Cooling Bleed off 0.2 TOTAL 7.2 Point of Final Discharge: Source Point of Final Discharge Boiler blow down Ash Quenching Cooling bleed off Greenery Domestic Septic tank followed by soak pit Waste Water Characteristics: Source Temperature PH Colour Boiler Blow Down 32 06 Normal Solid Waste Generation Non – Hazardous: Description Quantity Units Disposal Husk Ash 9 Tons/day Sold to Brick Manufactures DG set used oil 50 LPA sold to reg. recyclers Source of Air Pollution Air Stack Details: Stack Name Proposed Air Pollution Control System Stack Height above ground level Stack Top Are any standard of emission prescribed for or adopted by your industry Thermic Fluid boiler 15 lakh kal/hr Cyclomax, followed by bag filters 30mtrs Round/Circular Yes 10 TPH Boiler Cyclomax, followed by bag filters 30 mtrs Round/Circular Yes Nature of Dust: Stack Nature of Dust Quantity 10 TPH boiler Husk Ash 9TPD (SOLD TO REG. BRICK MANUFACTURES ) Fuel used details: Name of fuel Daily Consumption Unit Purpose Husk 48 Tons/day Boiler We ought we have provided all the information as per the query raised for the issue of C.F.E we now request our goodself to process our application and issue the CFE at the earliest. Thanking you Yours faithfully For SRI TULSI INDUSTRIES PARTNER Encl: 1. ETP Diagram 2. Boiler Technical Details |
| Inspection: | false |
| Inspection Note: | |
| Officer: | SRIkamar302535 |
| Reject: | false |
| Reject Note: | |
| Role: | Industry |