| Clarification Note: |
The industry has not submitted details of waste water generation, treatment and disposal, Air emissions (Boiler, Thermic fluid heater, DG set, Furnace etc.,) and its Air pollution control equipment, Solid/Hazardous waste generated and disposed. The industry shall fill the details and resubmit the application. The industry shall upload Process flow chart.
The proponent has paid CFE fee of Rs. 10,000/- through online against the required fee of Rs. 38,100/- under Orange category for both Air & Water Acts on an investment of Rs. 254 Lakhs. Balance fee of Rs. 28,100/- has to be paid by the proponent.
|
| File Note: |
The industry has not submitted details of waste water generation, treatment and disposal, Air emissions (Boiler, Thermic fluid heater, DG set, Furnace etc.,) and its Air pollution control equipment, Solid/Hazardous waste generated and disposed. The industry shall fill the details and resubmit the application. The industry shall upload Process flow chart.
The proponent has paid CFE fee of Rs. 10,000/- through online against the required fee of Rs. 38,100/- under Orange category for both Air & Water Acts on an investment of Rs. 254 Lakhs. Balance fee of Rs. 28,100/- has to be paid by the proponent.
|