
| Id: | 4880809 |
| Approve: | false |
| Approve Note: | |
| Clarification: | true |
| Clarification Note: | 1. The HCF has upgraded STP capacity from 15 KLD to 30 KLD, but during inspection the STP was not in operation. 2. The HCF is not segregating BM waste neither at the source nor at the CBMW room. 3. The HCF has not upgraded STP Capacity from 30 KLD to 36 KLD for increased bed strength from 50 beds to 100 beds. 4. The HCF is not mutilating the saline bottles before sending to CBMWTF. |
| Date Created: | 2023-11-01 13:56:17.284 |
| File Note: | 1. The HCF has upgraded STP capacity from 15 KLD to 30 KLD, but during inspection the STP was not in operation. 2. The HCF is not segregating BM waste neither at the source nor at the CBMW room. 3. The HCF has not upgraded STP Capacity from 30 KLD to 36 KLD for increased bed strength from 50 beds to 100 beds. 4. The HCF is not mutilating the saline bottles before sending to CBMWTF. |
| Inspection: | false |
| Inspection Note: | |
| Officer: | TSPCB031 |
| Reject: | false |
| Reject Note: | |
| Role: | RO EE |