Show ApplicationProcessingDetails

Id: 5143941
Approve: false
Approve Note:
Clarification: true
Clarification Note: After scrutiny of the application, the proponent has submitted land documents for Ac 6.35 gts to setup parboiled rice mill with paddy processing capacity 90 TPD. As per TSPCB guidelines, the processing of Paddy of 90 TPD capacity would be generated waste water of 95 KLD. The total area required is 10 acres. But the proponent acquired only Ac. 6.35gts only. Hence, it is directed to resubmit the application along with additional land documents and design details of ETP.
Date Created: 2024-03-27 12:12:32.937
File Note: After scrutiny of the application, the proponent has submitted land documents for Ac 6.35 gts to setup parboiled rice mill with paddy processing capacity 90 TPD. As per TSPCB guidelines, the processing of Paddy of 90 TPD capacity would be generated waste water of 95 KLD. The total area required is 10 acres. But the proponent acquired only Ac. 6.35gts only. Hence, it is directed to resubmit the application along with additional land documents and design details of ETP.
Inspection: false
Inspection Note:
Officer: TSPCB015
Reject: false
Reject Note:
Role: RO WGL EE