| Clarification Note: |
The industry CFO application is incomplete. The industry shall submit compliance of CFE order Dt: 30.09.2022 along with the details of waste water generation, ETP design details, air pollution control equipment provided to the stack & DG set, Solid waste generation and disposal details. The industry shall also submit the status of water flow meters, Energy meters, Online stack monitoring (10 TPH boiler), TSDF membership certificate etc. |
| File Note: |
The industry CFO application is incomplete. The industry shall submit compliance of CFE order Dt: 30.09.2022 along with the details of waste water generation, ETP design details, air pollution control equipment provided to the stack & DG set, Solid waste generation and disposal details. The industry shall also submit the status of water flow meters, Energy meters, Online stack monitoring (10 TPH boiler), TSDF membership certificate etc. |