Show ApplicationProcessingDetails

Id: 5315908
Approve: false
Approve Note:
Clarification: false
Clarification Note: Dear Sir / Madam, Greetings. As advised, enclosed please find the attachment of ETP Design and site plan with total area and built up area details for your reference. Below are the details: 1) Water Consumption - 10KL. 2) Waste Water Generation - 3 KL. Please do the needful. Thank you.
Date Created: 2024-07-16 15:15:46.592
File Note: Dear Sir / Madam, Greetings. As advised, enclosed please find the attachment of ETP Design and site plan with total area and built up area details for your reference. Below are the details: 1) Water Consumption - 10KL. 2) Waste Water Generation - 3 KL. Please do the needful. Thank you.
Inspection: false
Inspection Note:
Officer: KALYSangI671909
Reject: false
Reject Note:
Role: Industry