| Id: | 5403164 |
| Approve: | false |
| Approve Note: | |
| Clarification: | true |
| Clarification Note: | The industry shall submit the following details for further processing of your application. 1. As per the application, the line of activity of the proposed industry is Parboiled rice mill with a capacity of 28 TPD. As per the TGPCB guidelines the area of land required the following criteria. i. Plant : Ac. 0.5 and ETP : Ac. 0.5 ii. To utilize 10 KLD of wastewater Ac. 1.0 of land is required iii. 10 m wide green belt shall be developed along the boundary. iv. The total area of land required to set up the plant is as follows:- Capacity TPD Effluent discharge m3/day Area of land required for land application in acres. Total area. acres 20 25 2.5 3.5 25 30 3.0 4.0 30 35 3.5 4.5 Note: For the units who have adopted forced drying system Ac. 0.5 land may be deducted from the total area of land mentioned above. The proponent shall submit the area of the land accordingly as above for proposed capacity mentioned. 2. The proponent shall submit the details of EMP which shall include ETP, Air Pollution Control details, Solid Waste details etc., |
| Date Created: | 2024-09-11 16:06:25.045 |
| File Note: | The industry shall submit the following details for further processing of your application. 1. As per the application, the line of activity of the proposed industry is Parboiled rice mill with a capacity of 28 TPD. As per the TGPCB guidelines the area of land required the following criteria. i. Plant : Ac. 0.5 and ETP : Ac. 0.5 ii. To utilize 10 KLD of wastewater Ac. 1.0 of land is required iii. 10 m wide green belt shall be developed along the boundary. iv. The total area of land required to set up the plant is as follows:- Capacity TPD Effluent discharge m3/day Area of land required for land application in acres. Total area. acres 20 25 2.5 3.5 25 30 3.0 4.0 30 35 3.5 4.5 Note: For the units who have adopted forced drying system Ac. 0.5 land may be deducted from the total area of land mentioned above. The proponent shall submit the area of the land accordingly as above for proposed capacity mentioned. 2. The proponent shall submit the details of EMP which shall include ETP, Air Pollution Control details, Solid Waste details etc., |
| Inspection: | false |
| Inspection Note: | |
| Officer: | TSPCB009 |
| Reject: | false |
| Reject Note: | |
| Role: | RO EE |