Show ApplicationProcessingDetails

Id: 5756978
Approve: false
Approve Note:
Clarification: true
Clarification Note: The proponent shall submit the following details for further processing of the application:- 1. The proponent shall submit the products details in the product description. 2. As per the application you have mentioned total water consumption is 179.0 KLD (Public supply - 105.0 KLD and treated water from STP - 74.0 KLD) as per the EMP report, the total water consumption reported as 155.0 KLD. The same may be clarified. 3. Details of STP design and its capacity unit wise. 4. Waste oil to be generated, storage and its disposal from the DG sets.
Date Created: 2025-01-31 17:33:04.287
File Note: The proponent shall submit the following details for further processing of the application:- 1. The proponent shall submit the products details in the product description. 2. As per the application you have mentioned total water consumption is 179.0 KLD (Public supply - 105.0 KLD and treated water from STP - 74.0 KLD) as per the EMP report, the total water consumption reported as 155.0 KLD. The same may be clarified. 3. Details of STP design and its capacity unit wise. 4. Waste oil to be generated, storage and its disposal from the DG sets.
Inspection: false
Inspection Note:
Officer: TSPCB009
Reject: false
Reject Note:
Role: RO EE