| Clarification Note: |
The unit shall submit following.
1. The industry shall specifically submit a proof of the compliance whether the air pollution control equipment Bag Filter is installed to the coal fired boiler of capacity 6TPH.
2. The industry shall submit the production details Apr 2025 to Dec 2025
3. The industry shall submit the details of water meters, Energy meters provided in the unit (Raw water, ETP, APCE etc).
4. Balance CFE fee Rs.2,432/- for increased project cost of Rs.1,52,000/-.
|
| File Note: |
The unit shall submit following.
1. The industry shall specifically submit a proof of the compliance whether the air pollution control equipment Bag Filter is installed to the coal fired boiler of capacity 6TPH.
2. The industry shall submit the production details Apr 2025 to Dec 2025
3. The industry shall submit the details of water meters, Energy meters provided in the unit (Raw water, ETP, APCE etc).
4. Balance CFE fee Rs.2,432/- for increased project cost of Rs.1,52,000/-.
|