| Clarification Note: | As observed from the Topo & Site plans the proposed site is adjacent to NH-44 which is not meeting the sitting guidelines of the Board i.e As per the siting guidelines from transportation / communication system the industry shall maintain width of buffer zone from the Road Land Boundary i.e., National Highway–50 Mts, State Highway–40 Mts & MDR / Village Road-20 Mts. The proponent shall submit detailed EMP report comprising the following; i. Process Flow chart & description along with details of the machinery involved in the process along with capacities. ii. Raw material used along with chemicals in Kgs/Day (or) Tons/Day iii. Products manufactured in Kgs/Day (or) Tons/Day. iv. GPS coordinates (Longitude & Latitude) of the plant. v. Water consumption & waste waste generation and its treatment & disposal. vi. Sources of air pollution (Boilers, Generators etc.) and proposed air pollution control measures and equipment details. vii. Proposed DG set details if any. viii. Solid waste generation and its disposal details. ix. Proof of Project cost (Gross fixed assets) |
| Date Created: | 2026-03-06 17:13:40.078 |
| File Note: | As observed from the Topo & Site plans the proposed site is adjacent to NH-44 which is not meeting the sitting guidelines of the Board i.e As per the siting guidelines from transportation / communication system the industry shall maintain width of buffer zone from the Road Land Boundary i.e., National Highway–50 Mts, State Highway–40 Mts & MDR / Village Road-20 Mts. The proponent shall submit detailed EMP report comprising the following; i. Process Flow chart & description along with details of the machinery involved in the process along with capacities. ii. Raw material used along with chemicals in Kgs/Day (or) Tons/Day iii. Products manufactured in Kgs/Day (or) Tons/Day. iv. GPS coordinates (Longitude & Latitude) of the plant. v. Water consumption & waste waste generation and its treatment & disposal. vi. Sources of air pollution (Boilers, Generators etc.) and proposed air pollution control measures and equipment details. vii. Proposed DG set details if any. viii. Solid waste generation and its disposal details. ix. Proof of Project cost (Gross fixed assets) |
| Inspection: | false |
| Inspection Note: | |
| Officer: | TSPCB020 |
| Reject: | false |
| Reject Note: | |
| Role: | RO EE |